LogoSmall
Login
Rebar ERP · CAD to Billing

Manage rebar production from CAD to billing.

A single platform that ties together detailing, inventory management, fabrication, installation, and billing, built by people who know rebar.

Industry experience

20+ yrs

Transmission errors

Eliminated

What it covers

From the first drawing to the last invoice

Every stage of a rebar project lives in one connected system. No re-keying, no lost drawings, no surprises at billing.

Detailing

An AutoCAD-integrated detailing tool lets technicians place bars directly on the placement drawing. Barlists are generated automatically. No manual transcription.

Key benefitAutomated barlist generation

Fabrication

Barcodes on every bar tag feed cut & bend machines directly, removing the human relay between detailer and shop floor.

Key benefitZero transmission errors

Inventory management

QR-coded steel is scanned in on receipt and scanned out at production. Real-time stock levels and full traceability for every bundle.

Key benefitLive stock + traceability

Installation

Bundles are sized, labelled, and tied back to the drawing so crews on site know exactly what each tag belongs to and where it goes.

Key benefitDrawing-linked bundles

Billing

Aggregate deliveries by project, client, or period. Invoices reflect the steel that actually left the shop, not what someone remembered to log.

Key benefitDelivery-based invoicing
Why teams choose Metacis

Built by people who’ve run a rebar shop

Metacis isn’t a generic ERP with a rebar plug-in. Every screen, every workflow, every report comes from real shop-floor and field experience.

Hands-on support

Direct access to the team that builds the software. When something matters on site, you don’t wait in a ticket queue.

Reliable in production

Hosted on Amazon Web Services for enterprise-grade reliability and security. Your data is encrypted at rest and in transit, on the same infrastructure trusted by banks, hospitals, and Fortune 500 companies.

Industry knowledge

Estimation, detailing, fabrication, installation, billing. We’ve worked every one of them. The software reflects that.

In the industry20+ yrs
Lifecycle coverageEnd-to-end

Ready to see it in action?

Walk through Metacis with our team using realistic sample data.